A repair list you can pay for in stages

Get your repair plan

A staged plan, as we would write it

This is the shape of a plan we hand over after a Level 2 turns up several problems on one chimney. Each stage stands on its own: finishing stage one makes the fireplace safe to use, and stages two and three can be booked when it suits your budget.

  • Stage one, before any fire: flue tile repair or a new liner where heat can reach the brick (written figure), and a seized or broken damper (written figure)
  • Stage two, before the rains: entry points traced and sealed, $555 to $3,300; an uphill cricket where water stalls, $445 to $1,000, or $665 to $1,650 with all flashing renewed
  • Stage three, when ready: crown work (written figure); if wanted, a sealed gas insert in the old opening, $2,750 to $5,550; and a cap for the flue top, quoted on site

How the stages are decided

Stage one holds anything that lets fire, heat or flue gas reach the house: a gap in the lining, a firebox panel with open joints, wood framing too close to hot masonry, a damper stuck shut. These are the items NFPA 211 is most concerned with, and the fireplace stays cold until they are done.

Stage two is water. Rain getting into a chimney does slow damage, and in Signal Hill most of it arrives in a few winter storms, so these repairs go ahead of the wet months. Stage three holds items that protect the work already done or improve the fireplace, and can wait for a better time.

Proof the work was done

When the last stage you book is finished, we can run the camera again and issue a fresh report showing the repaired chimney. For a sale, an insurer or your own file, that second report is the record that the failed items were closed.

Each stage is priced on its own, so you can approve stage one today and leave the rest on paper until you are ready. Nothing in a later stage is started without your sign-off.

Published prices for common fixes

These are the repairs that most often appear in a staged plan. Liners, crowns, dampers, chase covers and flashing on its own carry a written figure in the plan.

Water entry found and stopped
$555 to $3,300
Uphill diverter for a wide stack
$445 to $1,000
Diverter built with every flashing piece renewed
$665 to $1,650
Sealed gas heater set into the old opening
$2,750 to $5,550
Camera re-check once repairs are finished
$390
Flue top cover, fitted
Quoted after we measure

Ranges are wide because chimneys differ. The plan says where in each range your job sits and why.

Questions about staged repairs

Does stage one have to be finished before we light a fire?

Yes. Stage one holds only the items that make the fireplace unsafe to use. Once they are fixed, the fireplace can be used while you plan the rest.

Can stages be combined to save a trip?

Often, yes. Where two stages need the same roof access, the plan notes it so you can decide whether to book them together.

We have a report from another company. Can you plan from it?

We read it and say whether it gives enough detail to stage the work. If the flue was not filmed, we usually need to run our own camera first.

What does code mean here?

The plan refers to NFPA 211 and to the maker's instructions for factory-built units. It does not stand in for a permit or a city sign-off where one is required.

Will the plan change once work starts?

Sometimes brick or tile proves worse once it is opened. If that happens we stop, show you what we found and give a written figure before going further.

Start with the stage that matters most

Book the inspection or send us the report you already have, and we will turn the list into stages with a price for each.